Handover is the only time when the developer is required to fix defects at their own expense (in practice: it’s the easiest and fastest way). If you “let something slide,” you’ll end up paying for it after the finishing work is complete.
What comes up most often during inspections
- crooked walls and floors (deviations, waves),
- leaky windows / poorly installed window sills,
- installation defects (outlets, safety features, lack of ventilation ducts),
- balconies and terraces (slopes, drains, insulation),
- defects in plasterwork, corners, and expansion joints.
How to Prepare (Practical Tips, No Theory)
- Bring: the contract + the finishing standards + the floor plan (printout or PDF).
- Take photos of every defect (with a measuring tape or point of reference).
- Record everything in the inspection report—no “we’ll work it out” excuses.
- Take your time. Set aside some time and go through the rooms systematically.
- If something is in dispute: note it in the inspection report as “to be verified / to be corrected.”
In practice: corrections made after the initial inspection are far less expensive than those made after the finishing work is complete (chipping, skimming, painting, dismantling).
Checklist 2026 – Summary (Key Points)
- Walls and ceilings: vertical/horizontal alignment, cracks, corners, plaster quality.
- Floors: levelness, cracks, expansion joints.
- Windows/doors: closing mechanism, seals, scratches, air vents.
- Ventilation: draft, no backdraft, vents.
- Electrical system: distribution panel, circuit breakers, number and placement of outlets.
- Plumbing: connections, leaks, water pressure (if possible to check).
- Balcony/terrace: slope toward the drain, watertightness of details, finishing.